JEDS Project Gallery
Path to Full Citizenship: Manitoba Legislature Ramp |
|
| Location: | Winnipeg, Canada |
| Category: | Institutional |
| Owner: | Province of Manitoba |
| Designer: | BridgmanCollaborative Architecture |
| Details: | |
| The challenge in this project was to blend new construction of a universal access ramp in a manner that did not detract from the existing architecture of the Manitoba Legislative Building; a National Heritage Site. It was a natural choice for JEDS to be awarded this government contract given our core strength in historical renovation. Our team completed the following work, on time, on budget. Summary of work completed: concrete works, installation of piles, grade beams, retaining walls, tyndall stone installation, heat trace system, surface lighting fixtures, landscaping, railings, zinc-clad steel canopy and all associated mechanical and electrical works. | |
Chez-Nous Interior Renovations |
|
| Location: | Winnipeg, Canada |
| Category: | Community Housing |
| Project Contact: | Gerry Giesbrecht |
| Owner: | Manitoba Housing |
| Designer: | Number Ten Architectural Group |
| Details: | |
| Working with Number Ten Architectural Group, JEDS installed a deep refresh of residential suites on three floors, hallways and renovated on seven floors of a multi-dwelling unit. Our primary work activities included millwork, flooring, doors & hardware, plumbing, electrical, and painting. And JEDS expertise extends to more technical systems work as we installed a new generator, sprinkler system, electric strike card access system for entranceways and elevators. This was an extensive renovation project and JEDS delivered an excellent product. | |
Redevelopment of Assiniboine Park Zoo Asiatic Lion Pavilion |
|
| Location: | Winnipeg, Canada |
| Owner: | City of Winnipeg |
| Designer: | Bridgman Collaborative Architecture Ltd. |
| Details: | |
| The Asiatic Lion Pavilion at the Assiniboine Park is one of the preeminent exhibits of this Winnipeg zoo. JEDS prepared this new home to Assiniboine’s tigers through renovation of the existing indoor exhibit. Construction included new roofing, insulation, glazing, eaves troughs and down pipes to prepare the Interpretive and Display Area addition. JEDS completed the project with storage room, washroom, vestibules and gated service area as well as new mechanical and electrical upgrade. Finishing touches were retaining walls and asphalt pathways to the Pavilion for wheelchair accessibility and surrounding landscaping work. Assiniboine Park Zoo put their trust in JEDS with one of their most prized exhibit spaces. | |
Garden of Memories |
|
| Location: | Winnipeg, Canada |
| Owner: | 500 Wing - Air Force Associatin of Canada |
| Details: | |
| JEDS coordinated this project, clearing the site for rebuild, installing paving stone, concrete, and landscaping the entire area. | |
John M King Daycare |
|
| Location: | Winnipeg, Canada |
| Project Contact: | Leslie Nutbean |
| Owner: | St. Matthews Kids Korner |
| Designer: | Everitt Design |
| Details: | |
| Interior renovations to convert classrooms into a daycare facility. The work included was demolition, new construction, painting, millwork, flooring, electrical, mechanical and specialty decor paneling. | |
India School - New Dance Floor Studio |
|
| Location: | Winnipeg, Manitoba |
| Project Contact: | Pam Rebello |
| Owner: | India Schoool of Dance, Music and Theatre |
| Designer: | Mitra Consulting |
| Details: | |
| Convert classroom into dance floor studio. Work included: new flooring, windows, ceiling, painting, associated electrical and mechanical works, exterior refresh of building. | |
Interior Renovations - Winnipeg Tax Centre |
|
| Location: | Winnipeg, Canada |
| Owner: | SNC-Lavalin OM |
| Designer: | Stantec Architecture |
| Details: | |
| Extensive flooring, painting and electrical upgrades including the installation of decorative wall panels and a major furniture reconfiguration. Work included: access floor tile, carpet, painting and electrical works. | |
Miles MacDonell Collegiate |
|
| Location: | Winnipeg, Canada |
| Owner: | River-East Transcona School Division |
| Designer: | MCM Architects |
| Details: | |
| Interior renovations, new addition, two new elevators, grooming room and misc. renovations. Work included: civil/structral work, demolition, roofing, concrete, concrete reinforcing, piles, grade beams and steel columns. | |
Refresh Common Areas - Manitoba Housing |
|
| Location: | Winnipeg, Canada |
| Owner: | Manitoba Housing |
| Details: | |
| Refresh common areas in community housing complex. Work included: new vinyl and ceramic tile flooring, painting, FRL panels, signage, washroom renovations, ceilings, electrical and mechanical works. | |
Hangar 16 Office Renovations |
|
| Location: | Winnipeg, Canada |
| Project Contact: | Marlow Prasek |
| Owner: | Defence Construction Canada |
| Details: | |
| This project involved the renovation of the office squadron at CFB 17 Wing Winnipeg. Work included: millwork, flooring, mechanical, asbestos removal, painting and upgrades to the sprinkler system. | |
St. James Collegiate Hairstyling Lab |
|
| Location: | Winnipeg, Canada |
| Project Contact: | Tim horton |
| Owner: | St. James Assiniboia School Division |
| Designer: | Sputnik Architecture |
| Details: | |
| Renovate hairstyling lab. Work included: new window installation, flooring, millwork, mechanical and electrical work. | |
Multi-Trade Services Standing Offer Agreement |
|
| Location: | Winnipeg, Canada |
| Category: | Various |
| Project Contact: | Darcy Wallin |
| Owner: | Department of National Defence - 17 Wing Winnipeg |
| Details: | |
| Work under this standing offer agreement has included a variety of renovations including but not limited to: interior and exterior renovations, carpentry, millwork, masonry, concrete, patio stone, windows, landscaping, ceilings, flooring, foundations, drywall, painting, electrical, mechanical, sprinkler systems and specialty applications. | |
New Healthcare Facility – Rockwood Institution |
|
| Location: | Stony Mountain, Canada |
| Category: | Renovations/Restorations |
| Project Contact: | Tim Lodge |
| Owner: | Rockwood Institution |
| Details: | |
| This project involves the renovations and relocation of 5 rooms and a lobby at the Administration Building F34 at Rockwood Institution, in Stony Mountain. Work included: mechanical works, electrical works, installation of new flooring, installation of doors, erection of drywall, painting. | |
SMHC - D12 Team Station Renovations |
|
| Location: | Selkirk, Canada |
| Category: | Renovations/Restorations |
| Project Contact: | Allen Nixon |
| Owner: | Manitoba Infrastructure and Transportation |
| Details: | |
| Removing and reconstructing the Team Station and associated areas of patient care at Selkirk Mental Health Centre. This included a reconstruction of the existing quiet room, a new medication dispensing room, and modifications to the existing bathrooms and adjacent seclusion rooms. Work included: demolition of existing walls, concrete work, millwork, floor finish, and associated electrical and mechanical work. | |
Outdoor Garden - Assiniboine Park Conservatory |
|
| Location: | Winnipeg, Canada |
| Category: | Renovations/Restorations |
| Project Contact: | Ken Beatie |
| Owner: | Assiniboine Conservancy (City of Winnipeg) |
| Details: | |
| Installed decorative paving stone and slate slab retaining wall for garden area and wheelchair access. | |
East Side Hangar 10 - 17 Wing DND |
|
| Location: | Winnipeg, Canada |
| Category: | Renovations/Restorations |
| Owner: | 500 Wing (Air Force Association of Canada) |
| Details: | |
| Replace sidewalk and leveling of paving stone. | |